Project Outcomes
We entered a Design Assist relationship with the builder and client to collaborate on bringing the cost in line with the budget and worked with the client to reduce the lab's working capacity while maintaining the highly sophisticated systems required for production.
To manage cost and construction timelines, our VDC department facilitated 3D-design collaboration for the entire project. During construction, our teams utilized their expertise to install and commission a high-quality system to the standards and guidelines outlined in our modelling. A large portion of the project was prefabricated off-site in our controlled shop environment.